Site
Tamines
Year
2018
Client
Infrabel
Project Description
Foundation work for poles and support posts for overhead lines;
Installation of poles, support posts, consoles, crossbars, stays, metal equipment, infrastructural equipment etc.;
Work on transfers, slippages and rehanging with mechanical re-tensioning and adjustment of the contact lines (including sectioning) and of the existing earth cable;
Work on rolling out new overhead lines, new earth cables on the main lines A and B between Tamines and Le Campinaire as well as the changes required following modifications to the course of the rails at Le Campinaire station;
Work on creating new sections;
Work to change existing sections;
Dismantling of existing overhead lines, poles, consoles, crossbars, anchoring, metal and other equipment etc. that are no longer usable;
Various tasks such as the creation of blocks;
Conducting of feasibility studies for the work on the overhead lines;
Provision of metal equipment, concrete blocks and other materials required for the work;
All the work was done on Line 130 between BK 82.900 and BK 88.000.